When is the Scenic going to be up and running for 2007?

The Save Dreamland Campaign was launched by Joyland Books in January 2003 and is now supported by several thousand people. This is the place to discuss all aspects of saving Margate's famous amusement park and its iconic , Grade II listed Scenic Railway, Britain's oldest roller coaster.

Moderators: dave771, porf, Sarah

Postby Nick » 02 Jun 2007, 08:29

Zoidstar wrote:Most of the time if you are planning to keep the building.structure the same colour than planning permishion is not needed as you are not changing the fabric (look) of the building however permision can be difficult to obtain if you are planning to change the colour radically.


Just to clarify: Planning permission is not needed for any maintenance works to the Scenic Railway, even a complete colour change (including pink with white spots on).

Listed building consent is also not needed for annual/daily maintenance or touching up the paint. A complete colour change, or any other works that might affect the appearance of the structure, may need listed building consent and it would be advisable to discuss with the Council.
Nick
www.joylandbooks.com
The Home of Amusement Park Books
User avatar
Nick
Site Admin
 
Posts: 791
Joined: 25 Jan 2003, 20:13
Location: Oxfordshire

Postby EAS » 02 Jun 2007, 08:58

'Bob's entitled to his opinion. He's obviously very connected with the company planning the development and despite his occasional lapses, he knows a great deal about fairground rides and their costs & profitability, and demographics for comparable British seaside resorts and the value of their land when used for housing and retail.

He also has a great knowledge of Dreamland's trading figures over the course of the last fifteen years or so, and is obviously acquainted with the Scenic Railway on a hands-on basis.

So whoever he is, he isn't a "Boob". I just wish he was man enough to state his name and his true interest in Dreamland when saying his thing.'


Actually Bob hasn't the inside information you are suggesting I don't think. I wouldn't credit him with being anything but a troll with a hazy knowledge gleaned from a bit of reading which he pretends is inside info.

It's not. Much of it is very, very wrong, broad brush assertion to suit his own ends. When challenged he cannot provide his sources.

I quite enjoy reading Bob as it's so very clear he hasn't much idea and it's fun and keeps the site lively to point out the error of his ways, but don't credit him with any sort of in-depth knowledge.
User avatar
EAS
 
Posts: 1886
Joined: 18 Sep 2006, 09:09
Location: North

Postby Zoidstar » 03 Jun 2007, 22:33

Nick wrote:
Zoidstar wrote:Most of the time if you are planning to keep the building.structure the same colour than planning permishion is not needed as you are not changing the fabric (look) of the building however permision can be difficult to obtain if you are planning to change the colour radically.


Just to clarify: Planning permission is not needed for any maintenance works to the Scenic Railway, even a complete colour change (including pink with white spots on).

Listed building consent is also not needed for annual/daily maintenance or touching up the paint. A complete colour change, or any other works that might affect the appearance of the structure, may need listed building consent and it would be advisable to discuss with the Council.


Just going by what happened to a mate when he wanted to re-paint his listed cottage, it was in a very shabby "white" more rotten white thanks to lack of care and maintenance,

anyway he started to strip the old pealing paint off re-pointed the parts of the wall that needed re-pointing and painted the window frames from red to black he was halfway through the re-painting of the walls when council officals stopped him and informed him that he needed planning permission for the work, he was granted permission retrospectivly.
Zoid on!
Zoidstar
 
Posts: 296
Joined: 01 Jul 2003, 12:12

Postby Bob » 04 Jun 2007, 17:31

Zoidstar wrote:
Nick wrote:
Zoidstar wrote:Most of the time if you are planning to keep the building.structure the same colour than planning permishion is not needed as you are not changing the fabric (look) of the building however permision can be difficult to obtain if you are planning to change the colour radically.


Just to clarify: Planning permission is not needed for any maintenance works to the Scenic Railway, even a complete colour change (including pink with white spots on).

Listed building consent is also not needed for annual/daily maintenance or touching up the paint. A complete colour change, or any other works that might affect the appearance of the structure, may need listed building consent and it would be advisable to discuss with the Council.


Just going by what happened to a mate when he wanted to re-paint his listed cottage, it was in a very shabby "white" more rotten white thanks to lack of care and maintenance,

anyway he started to strip the old pealing paint off re-pointed the parts of the wall that needed re-pointing and painted the window frames from red to black he was halfway through the re-painting of the walls when council officals stopped him and informed him that he needed planning permission for the work, he was granted permission retrospectivly.


The legislation is open to interpretation and different council may interprete the legislation in different way but in general if it is intended to repaint a listed structure its wise to seek consent first
Bob
 
Posts: 509
Joined: 30 Nov 2003, 21:21

Postby EAS » 04 Jun 2007, 17:57

No he didn't require planning permission - but as he was altering the character by a change of colour he required Listed Building Consent.

That's a different consent.
User avatar
EAS
 
Posts: 1886
Joined: 18 Sep 2006, 09:09
Location: North

Postby Zoidstar » 04 Jun 2007, 22:28

EAS wrote:No he didn't require planning permission - but as he was altering the character by a change of colour he required Listed Building Consent.

That's a different consent.


Thats where the problem arose the original colour of the cottage of 1653 was black & white and had been up till the the previous owners took it on in arrounf 1935 they had not painted the walls since the end Second World War but did paint the window frames from black to white to blue before finishing on red so the true colour had been changed already.

my mate was simply putting the original colour back on the frames he knew the right colours from church/council papers but was nabbed for doing so,

All I am saying is check with the local authority first, if planning permission had gone againt my mate he could have had a fine or gone to jail!

Below is an extract from the paper work from the case:


Listed Building Consent is required in order to carry out any works to a Listed Building which will affect its special value for listing purposes. This will almost certainly be necessary for any major works, but may also be necessary for minor alterations and possibly even repairs and maintenance. Listed Building Consent may also be necessary for a change of use of the property.

Works such as re-pointing and even repainting can give rise to the need for a Listed Building Consent, even if planning permission is not necessary. Replacement windows and doors are common areas of controversy and strict control.

Identical repairs in matching materials may not require consent, but it is always advisable to check with the Councils' Listed Buildings Officer, (usually in the Planning Department) before undertaking any work.


Just check first you dont want a court case that may harm the Save Dreamland Campaign's to save the park for the future generations.
Zoid on!
Zoidstar
 
Posts: 296
Joined: 01 Jul 2003, 12:12

Postby EAS » 05 Jun 2007, 17:45

Listed Building Consent (which is free to apply for ) is not Planning Permission which isn't.

Different consents.

In reality what would have happened is that an enforcement notice would have been served - long way to go before a fine or jail!

Yes a chat with the Conservation Officer is always wise to see if he thinks LBC is required.
User avatar
EAS
 
Posts: 1886
Joined: 18 Sep 2006, 09:09
Location: North

Previous

Return to Save Dreamland Campaign Forum

Who is online

Users browsing this forum: No registered users and 5 guests