Re: New Plans for 2017
Posted: 19 Apr 2017, 10:10
Some photos from last weekend of the construction and site attached.
Generally there's a lot of infrastructure going in in the park (cables, drainage etc) and landscaping. But to me the location of the new stage where the Kiss Me Quick Caterpillar was and the very large banked walkway near the menagerie cages seems to leave a lot less ride space. The have also cleared all the scrap from the rear of the site and appear to have started some work on the deco style building at the rear of the park. Let's hope the revamp uses the money invested in Sands by Arrowgrass wisely to create a park rather than an events space with a few rides.
They have applied to demolish the old Thai restaurant (or part of) next to the car park entrance.
The work being carried out by TDC on the Cinema building and entrance is looking great, will be good to see this restored fully.
Generally there's a lot of infrastructure going in in the park (cables, drainage etc) and landscaping. But to me the location of the new stage where the Kiss Me Quick Caterpillar was and the very large banked walkway near the menagerie cages seems to leave a lot less ride space. The have also cleared all the scrap from the rear of the site and appear to have started some work on the deco style building at the rear of the park. Let's hope the revamp uses the money invested in Sands by Arrowgrass wisely to create a park rather than an events space with a few rides.
They have applied to demolish the old Thai restaurant (or part of) next to the car park entrance.
The work being carried out by TDC on the Cinema building and entrance is looking great, will be good to see this restored fully.