Older plan: http://www.joylandbooks.com/scenicrailway/images/2810_ProposedMasterPlan_200.jpg
newer plan: http://www.joylandbooks.com/scenicrailway/documents/masterplan-phase5.jpg
The one on the left appears to be the older plan? Which shows the river caves and log flume as well as the other rides that were listed on the dreamland website until the update.
But on the newer plan there are rides that i wassnt aware of such as a water slide. Anyone have any ideas what this water slide is?
or what an 'animal cavalcade station' or 'veteran station' is?
The newer plan is also titled 'phase5' i wanna see 1,2,3 and 4 .
I know not all the rides can be build on one phase. However this master plan does not seem to allow any space for:
- water chute
river caves
two bembom era rides
cable car
meteorite
caterpillar
mirror maze
Haunted swing
http://www.joylandbooks.com/scenicrailway/heritageamusementparkrides.htm
Do we know the final ride line up? And if the newer plan is the ultimate goal, Does that mean we can never expect to see the log flume, river caves etc? As there is no remaining space? Or is there a newer masterplan. I thought that now being in 2015 there would be a clearer idea of what the actual ride line up will be.
My only thought is that the 'waterslide' pool will be used in the log flume and the 'guest ride' area will be removed to make space for the caves and logflume in the south of the park?
just wish i could see and examine all the upto date plans =D I was a bit of a sado the other day and tried to make the whole park, by the plans on roller coaster tycoon...... Becoming a bit obsessed
Is there somewhere with the upto date plans and rides?