hi jim
i cant answer why the cyclone was demolished,cause im not in a position to answer that,what i was getting at was it was a shame the council didnt purchase the lease sooner and stop the historical ride being flattened
the council in southport want to lease the grounds for the summer season to a travelling fair with the remaining rides still there, ie king solomons mines (1950s wild mouse) plus river caves.there is also a big wheel log flume and other bits and bobs there just waiting to be re-used.
the council want to find a long term lease holder for the site to be used as an amusement park,so that cant really be called bad news can it,only good from what i can see.
i was lucky to be able to ride the now demolished cyclone last year and its destruction was unecessary,but if the other rides can be saved instead of them going the same way surely you would agree thats a good thing?
its quite ironic that we have got thanet council and waterbridge trying to get rid of any traces of dreamland and redevelop the site into yet another leisure facility,meanwhile southport council are finding ways to maintain pleasureland as an amusement park
makes you sit and think does it?
i wouldnt write off pleasureland obviously southport council can see it still has massive potential which i totally agree with
i have enclosed a link so you can see ride videos of cyclone and king solomons mines in action.and a video of the entire park when it was running last year.
http://www.ukrides.info/pleasureland.htm